Plan Room

Current Jobs out for Bid!

Note: Please enter your Search Terms as needed.

Search Zip: Radius: State: Search  
Project Info
Woodside Senior Communities Building Renovations - Green Bay, WI - Bids Due: 09/20/2019
The Woodside project has multiple renovations to their existing buildings. The drawings will be ready late summer and plan on bidding during September and construction Fall of 2019 and finishing up thru the winter. There will be a pre-bid walkthrough to be scheduled. These projects consist of: New entry Connector Link between two buildings Interior open area 2nd floor fill in Roof dormers Interior remodeling Please contact Sean Duncanson with any questions at sduncanson@hoffman.net
Kiel School District - BP#1 - Kiel, WI 53042 - Bids Due: 09/16/2019 2:00 PM
Auditorium Addition Bid Package 1 - Site, Steel, Precast and Concrete - PLANS WILL BE AVAILABLE AUG. 28TH (DATE COULD CHANGE) Bid Package 2 - Remainder of scope Bids
Wittenberg-Birnamwood School District BP#2 - Wittenberg, WI 54499 - Bids Due: 09/03/2019 11:00 AM
Wittenberg-Birnamwood High School: Size: 25,351 sf of renovations, 7,280 sf of new construction New construction of a stand-alone building will include spaces and features such as a construction trades room, tool storage area, animal room, maintenance and mechanical rooms, activity room, office, mudroom, classroom, aquaponics area, and greenhouse. Interior renovations at the high school include features such as shower areas, coffee shop, fitness training area, sewing area, art rooms, mechanical, metal, and engine rooms, and computer and STEM labs. Birnamwood Elementary School: Size: 687 sf of renovations, 2,877 sf of additions Renovations will include areas such as the music room, family bathroom, and security and accessibility improvements on the first floor. There will also be a 2 classroom addition on the southeast corner of the building. Wittenberg Elementary School: Size: 5,505 sf of renovations, 5,154 sf of additions Renovations will include areas such as the 4K classroom, kindergarten classrooms, first floor entrance, art classroom, office, and accessibility improvement to the laundry room. The 2-floor addition will include 2 first grade classrooms seperated by a corridor on the first floor, a music room, mechanical room, boys and girls restrooms, and an office on the second floor.
School District of Manawa BP#2 - Manawa, WI 54949 - Bids Due: 07/30/2019 02:00 PM
Fitness Center, and Administration addition at High School, along with interior renovations throughout. Interior renovations at Elementary School Send out Bids – July 5th Bids Due – July 30th
U.S. Venture - Appleton, WI 54911 - Bids Due:
Bidding Fall 2019 / Spring 2020
City of Appleton - Bluff Ramp - Appleton, WI 54911 - Bids Due:
Bidding Fall 2019
FSPA - Landscape Package - La Crosse, WI 54601 - Bids Due:
Bid package to cover landscape and site work. This includes plantings, concrete footings and foundations, and new structures throughout the property.

© 2018 Hoffman Planning, Design & Construction, Inc.

Website Developed By: Balance Interactive Studios
Plan Room Powered By: Pantera Tools